▶ Free · Safety Stock Calculator
How much safety stock should you hold?
Enter your daily demand, its variability, your lead time and the service level you target. Safety stock and reorder point are calculated instantly, and the chart shows what a higher service level costs in stock.
Runs in your browser · your data is never sent to any server
Safety stock
191.8 units
Reorder point
1,091.8 units
Expected demand during lead time
900 units
z value: 1.645
Safety stock (units) · Service level
▶ How it's calculated
- Safety stock = z × √(L × σd² + d² × σL²). d is average daily demand, σd the standard deviation of daily demand, L the average lead time in days, σL the standard deviation of lead time, and z the standard normal value for the target service level.
- Reorder point = d × L + safety stock.
- Service level here is the probability of not running out during one replenishment cycle (cycle service level). Demand is assumed to be roughly normally distributed.
- For slow, irregular sellers this assumption breaks down and different methods are needed.
Let's read the result together.
In a short call we go through your result together and talk about where it makes sense to start. The "Let's talk about the result" button under the tool adds a summary of your result to the booking notes.
Book an intro call▶ Other tools
- FreeData Quality CheckFind missing, duplicate and inconsistent data in your CSV or Excel file in seconds.Open the tool
- FreeManual Reporting CostCalculate how many hours and how much money manual reports cost each year.Open the tool
- FreeData Maturity TestMeasure your data maturity in 15 questions across five dimensions and find your weakest area.Open the tool