▶ Free · Manual Reporting Cost
What do manually built reports cost you each year?
Enter the reports you build regularly, how often, and how many people spend how much time on them. Annual hours, cost and full-time equivalent are calculated instantly.
Runs in your browser · your data is never sent to any server
ReportFrequencyPreparation time (hours)People
Hours per year
717
Cost per year
TRY 358,500
Full-time equivalent
0.4
Assuming 1,800 productive hours per year
Weekly sales report
208 hours
Monthly management report
384 hours
Daily stock report
125 hours
▶ How it's calculated
- Repeats per year: daily 250 working days, weekly 52, monthly 12, quarterly 4.
- Annual hours = preparation time × people × repeats per year. Annual cost = annual hours × hourly cost.
- The hourly cost is your own input; using the fully loaded cost (salary, bonus and benefits) is recommended.
- Full-time equivalent assumes 1,800 productive working hours per year.
Let's read the result together.
In a short call we go through your result together and talk about where it makes sense to start. The "Let's talk about the result" button under the tool adds a summary of your result to the booking notes.
Book an intro call▶ Other tools
- FreeData Quality CheckFind missing, duplicate and inconsistent data in your CSV or Excel file in seconds.Open the tool
- FreeSafety Stock CalculatorCalculate safety stock and reorder point from demand and supply variability.Open the tool
- FreeData Maturity TestMeasure your data maturity in 15 questions across five dimensions and find your weakest area.Open the tool